When to install Foundation Version and when Steel Frame Version?

Only Saurer Product Line offers its embroidery machines as steel frame execution or as foundation execution.

In steel frame execution, the complete construction (base and upper part of the machine) is made of cast iron. The foundation execution consists of a concrete foundation below the operator level, whereon the upper machine part is placed.
Due to the modular system, both executions are available for all machines, offering different advantages and special benefits according to your requirements.

Advantages of the foundation version Advantages of the foundation version:

  • Higher machine speeds
  • Lower investments in the machine (note the foundation costs)
  • Lower vibrations
  • Lower noise levels

Advantages of the steel frame version Advantages of the steel frame version:

  • Faster installation time resulting in the machine being ready for operation more rapidly
  • Less foundation costs as only a base-plate is required
  • Easy to relocate in house and to other plants
  • Higher resale value thanks to quick and simple reinstallation